Upgrading the main electrical panel in a commercial building can be a daunting and expensive task, but with some planning and cost-saving measures, it can be done on a tight budget. As the building owner, I want to share my experience and recommendations for keeping costs down when replacing a commercial panel.
Assess the Existing Panel and Electrical Load
The first step is to thoroughly evaluate the existing electrical panel and understand the building's electrical load requirements.
-
Hire a licensed electrician to inspect the current panel and provide a detailed assessment of its condition, capacity, and any deficiencies. They can help determine if a panel replacement is warranted or if upgrades to the existing panel are sufficient.
-
The electrician should conduct a load calculation to determine the electrical demand of the building based on the size, equipment, lighting, and other loads. This information helps right-size the new panel.
-
Verify that the new panel's voltage, amperage capacity, number of circuits, and other specifications align with the building's electrical load needs. Don't oversize the panel substantially beyond current needs as that adds unnecessary expense.
Explore Panel Replacement Options
There are often ways to get the electrical capacity you need without overspending:
-
Instead of replacing the entire main breaker panel, see if replacement breakers or subpanels can be added to supplement the existing main panelboard. This is often a lower-cost option.
-
Evaluate if a refurbished or reconditioned panel is acceptable. Used commercial electrical panels in good condition can save 50% or more compared to buying new.
-
Research prices from multiple electrical supply vendors to find the best deals on a new panel and required components. Avoid overpaying.
Use Cost-Saving Installation Strategies
The installation itself offers opportunities to complete the upgrade economically:
-
Have the existing panel relocated to a more convenient location if beneficial. Relocation is generally cheaper than installing a totally new panel and wiring.
-
Perform basic demolition like drywall removal and simple trenching yourself to save on labor costs.
-
If your business can tolerate a short power outage, schedule the panel swap during off-peak hours to avoid expensive temporary generator rental costs.
-
See if the electrician can use existing conduit and wiring and just replace the panel itself. Reusing existing infrastructure saves tremendously on materials and labor.
Consider a Split Panel Approach
For large commercial buildings with heavy electrical loads, consider splitting the upgrade into dual subpanels rather than attempting to replace the entire panel at once:
-
Install one subpanel with essential circuits to maintain critical building functions.
-
Slowly replace remaining breakers and circuits in the old panel with a second new subpanel over time.
This staged approach can help mitigate installation costs, power downtime, and electrical complexity compared to a sole massive new panel.
With careful planning, creative cost-saving measures, and coordinated phasing, upgrading a commercial building's main electrical service panel is very achievable on limited budgets. Proper assessment of electrical loads, flexible approaches, and utilizing existing infrastructure are key factors for controlling expenses. The project takes time and expertise, but is very worthwhile for bringing a building's power delivery up to modern standards.